Leave Penpal a standing instruction
Edit in CMSSome things are worth more than one reply — going through a year of sends, watching what comes into your curations over a week, reading every newsletter you schedule with fresh eyes. Ask for work like that — “go through my last twenty sends and tell me which subject lines pulled best” — and Penpal can take it away, finish it after the conversation ends, and come back to you when it’s done. You can close the tab.
Set one up in the conversation
Section titled “Set one up in the conversation”- Open Penpal from the speech-bubble button in the top bar.
- Ask for the work and say when it should come back.
- Penpal reads the day and time back. Approve it, and the instruction is set up.
Name a time and it waits for then instead of starting now:
- “Tomorrow at 7am, look through what I’ve curated about school funding and show me what’s there.”
- “Friday afternoon, check whether the events roundup is still pulling its weight.”
Ask for it to come back and it becomes a standing instruction — something Penpal keeps doing until you stop it:
- “Every weekday morning at 7, give me the overnight numbers.”
- “Every Friday, pull the five best things from my curations this week.”
- “Monthly, tell me how my open rate is trending.”
A repeating instruction picks up its rhythm from the first time you give it: “every weekday at 7am” fixes the hour, “every Friday” fixes the day, and a monthly one has to start on the 28th of the month or earlier so it lands every month rather than skipping February.
Each instruction gets a short name, such as “Analyze my newsletter subject lines”, which Penpal writes when it sets the instruction up. That name is what you see in lists and headings, and the full wording you gave is kept in the details. Instructions set up before names existed show the start of what you asked instead.
Penpal reads the day and time back to you before it sets anything up, so a misunderstanding is caught in the conversation rather than at 7am tomorrow. If it isn’t sure which time zone you’re in, it asks — a task set in the wrong zone runs hours off and nothing about it looks wrong until you miss it.
Or when something happens, rather than at a time
Section titled “Or when something happens, rather than at a time”Instead of a time, you can name a moment to wait for:
- “When a newsletter is scheduled, review it and tell me what you’d change.”
Right now there is one thing Penpal can watch for — a newsletter actually being scheduled to send. Ask it to watch for something else and it will tell you plainly that this is the only one it can watch today, rather than agreeing and quietly doing nothing.
What a standing instruction can and can’t do
Section titled “What a standing instruction can and can’t do”A standing instruction reads, researches, and reports. It can look through your newsletters, your audience, your curations and your numbers, and write you an answer. It cannot create, change, send, or delete anything while you’re away — if you ask for something that would, Penpal says so at the time rather than accepting it and surprising you later.
Long jobs are fine. If the work needs more digging than one stretch allows, it carries on across several, and if it genuinely runs out of room it tells you it stopped partway instead of handing you half an answer dressed up as a whole one.
How the answer reaches you
Section titled “How the answer reaches you”The answer waits for you in the app as a notification in the bell, and selecting it takes you straight to the report. Ask for it by email — “email me the results” — and it arrives in your inbox as well. It goes to you and nobody else; if you ask for it to be sent to a colleague, Penpal will tell you it can only send it to you.
If a run can’t finish, you hear about that too, rather than being left waiting for something that isn’t coming. That holds when the work simply stops as well as when it fails: if a run is picked up and never comes back, Penpal eventually notices, tells you, and marks it as one that didn’t finish, so you are not left watching for an answer that will never arrive. Telling a lost run from a slow one takes about six hours, so that notice is not immediate — a run still going at that point has run longer than any standing instruction is meant to. News that a run failed always comes to you in the app, and if you asked for the results by email, you’ll get an email about the failure too — so a failure reaches you the same way a successful run would have.
Penpal doesn’t speak up in the conversation when a run finishes — the notification is how you find out. If you’ve turned the in-app notice off in your notification settings and haven’t asked for email, Penpal tells you so when it sets the instruction up and says the result will be waiting on the Standing instructions page, rather than promising a notification you won’t get.
A repeating instruction remembers what it told you last time and reports what’s changed rather than resending the same finds every morning — and if nothing has changed, it says so plainly, which is a useful answer rather than a failed one.
Read a run’s report, and ask about it
Section titled “Read a run’s report, and ask about it”Every run has its own page. On the Standing instructions page, choose Show details on an instruction and then See its runs; open a run from there to read what it found, laid out as a readable report. A run that is still going says it’s in progress, and one that didn’t finish says so instead of showing an empty page.
Ask Penpal about this on a report opens the assistant with that report already in the conversation, so you can ask follow-up questions about it.
Ask what you’ve got running, or call one off
Section titled “Ask what you’ve got running, or call one off”You don’t have to leave the conversation to keep track of them:
- “What have you got running?” lists the company’s standing instructions, how often each one repeats, when it last ran, and whether that run finished — the same list the page below shows, including colleagues’ instructions.
- “Stop the school funding one.” calls it off, whoever set it.
- “Move the Friday one to Monday at 8am.” changes when it next runs, keeping the same instruction and its history; a one-time instruction that already ran gets a new run. Penpal reads the new day and time back to you first. An instruction that waits for something to happen has no time to move, and Penpal says so. A paused one doesn’t run again until you turn it back on, whatever time you give it.
A run already under way finishes — stopping an instruction prevents the ones still to come, so if one is mid-flight when you call it off, Penpal says so rather than letting an answer arrive after you thought you’d stopped it.
See and manage your standing instructions
Section titled “See and manage your standing instructions”Standing instructions
- Repeats
- every weekday at 7:00 AM
- Next run
- Nov 23, 2026 7:00 AM
- Sent to you
- In the app and by email
- Repeats
- when a newsletter is scheduled
- Next run
- Nothing more to come
- Sent to you
- In the app
- Repeats
- every Friday at 4:00 PM
- Next run
- Nothing more to come
- Sent to you
- In the app
- Repeats
- once
- Next run
- Nothing more to come
- Sent to you
- In the app
- Choose Show details to see how often it repeats, when it runs next and how its answer reaches you.
- Turn its switch off to pause it. Turn it back on to resume.
- Choose the trash icon, then Delete, to stop it for good.
Standing instructions are listed on your company’s Standing instructions page, which you open from the company menu.
Standing instructions belong to the company, not to the person who set them up. What anyone at the company has asked Penpal to keep doing appears here, and anyone can pause or delete a colleague’s instruction as readily as their own. So this list is where you find out what the company has running in the background, and it is worth a look before you set something up that may already be running for somebody else. What isn’t shared is the answer: results go to whoever asked for the work, and to nobody else.
Pausing and deleting from this page needs company administrator access; asking Penpal to stop one does not. The list shows the 25 most recent, which is well past what a company is expected to have running at once.
Each row shows the instruction’s short name, its current state and when it last ran. A run that didn’t finish reads Didn’t finish beside its time, so a failure looks like a failure rather than like an instruction that has never run. When a run is coming, its time shows under the last one as Next run. Show details on a row gives you the rest: how often it repeats (Repeats), when it runs next, how the answer reaches its owner (Sent to you), and a See its runs link to its runs and their reports, where the full instruction is shown too.
The list updates by itself as runs start and finish and as instructions are created or deleted, so you don’t need to reload the page.
An instruction’s state is one of these: Running means a run is under way right now; Paused means it won’t run until you turn it back on; Scheduled means it’s on and waiting, for its next time or for the thing it watches for to happen. A one-time instruction that has run reads Completed, or Failed if it didn’t finish, rather than staying on Scheduled.
From here you can:
- Pause one with the switch on its row, and turn it back on with the same switch. It keeps its place while it’s paused. A repeating one then picks up at its next proper occurrence rather than replaying the one it missed; a one-off still owes you its single run, so resuming it runs that run late rather than dropping it. Pausing an instruction while a run is already under way doesn’t stop that run: it finishes and its answer still reaches whoever asked for it, though the row reads Paused while it does.
- Delete one with the trash icon on its row, then Delete to confirm. It stops for good. Anything it has already sent you stays where it is.
You can’t create a standing instruction on this page. You ask Penpal for one in the conversation, in your own words; this page is where you keep an eye on it afterwards.
Times are shown in the time zone you set the instruction in, so “every weekday at 7am” reads as 7am even when you’re reading it from somewhere else.
Related
Section titled “Related”Still can’t find what you need? Contact support.